Dynamic Capacity Expansion with Energy Storage – Factory in Xuzhou, Jiangsu Province
BACK

Project Overview

Case Details

Dynamic Capacity Expansion with Energy Storage – Factory in Xuzhou, Jiangsu Province


Project Pain Point:
The customer has a 250kVA transformer. No local capacity expansion quota is available. There is an urgent need to expand production. A 125kW/261kWh energy storage system was selected.


Core Configuration:
125kW/261kWh LiFePO₄ battery energy storage + intelligent EMS


Technical Highlight:
Peak shaving rate of 45%, precisely matching the load profile of tea-making equipment.


Implementation Results:
Transformer load rate reduced from 110% to 80%, eliminating tripping / outages.